Ground Testing

Pre-flight validation procedures performed on aerospace vehicles to verify system integrity, propulsion performance, avionics functionality, and structural safety. Includes static fire tests, tank proofs, checkout flows, and integration checks. Critical for risk mitigation and certification before launch commit.

Recent Operations & Updates

Key Activities

  • Static Fire Tests: Engine ignition on ground to verify thrust, telemetry, and shutdown sequences.
  • Tank Proofs: Pressurization tests to validate structural limits and leak detection.
  • Checkout: Sequential verification of subsystems via automated flows and manual inspections.